Equipment Installation
1. when loading and unloading the machine tool with a crane, the machine tool shall not be impacted or violently vibrated. Under no circumstances shall it be excessively tilted, inverted or placed in an unstable place. When the roller is used to move on the inclined surface, the slope shall not be greater than 15 degrees, and the roller diameter shall be 60mm to 80mm. When loading and unloading the crane, do not use ropes to collide with weak parts. Wooden blocks shall be added at the contact position between the steel cable and the machine tool to protect the appearance of the machine tool. The handling shall be carried out in accordance with the relevant regulations and procedures for the handling of precision mechanical equipment. If the loss is caused by non-compliance with the regulations, our factory will not be responsible for compensation.
2. The machine tool shall be installed on a flat and firm ground. Before the installation of the machine tool, the user shall provide four pairs of wedges, use a level gauge and level the machine tool with the help of wedges. The longitudinal level shall not exceed 0.10/1000 The horizontal level shall not exceed 0.05/1000
3. after the installation of the machine tool, fill hydraulic oil and cutting fluid as required. Fill the lubricating oil according to the requirements of the lubricating system.
4. Test the machine and check whether the mechanical and electrical systems of the machine tool work well, whether the lubrication is sufficient and whether the installation is intact.
Package & Delivery:
the product is packed in waterproof file and standard carton, wood and steel structure, we make sure the product good in transportation. we will send machine on time and choose TNT, DHL, FEDEX and so on famous international logistic company. we also packed and deliver as customer's special requirement.
Factory Show:
FAQ: